Installation

From reserved design to flipping the switch.

Going solar is mostly a paperwork-and-scheduling journey, not a construction project. Here’s every step between your deposit and the day your system turns on — and who’s responsible for each wait.

The timeline

Eleven steps, start to finish

Every project moves through the same eleven stages. Durations depend on your city and utility, so the day counts below are illustrative PLACEHOLDER estimates until we confirm your jurisdiction. You can watch your own project move through these same stages in your project portal.

  1. Step 1: Reserve & deposit

    0–1 days · PLACEHOLDER

    You reserve your design online with a fully refundable deposit. No full payment is collected yet.

    Your project is created and a Voltayne advisor is assigned. The deposit simply holds your place so we can begin engineering — it is refundable until you accept your final design.

    What you'll do

    • Place your refundable deposit
    • Upload a recent electric bill (optional, speeds up design)
  2. Step 2: Engineered design

    3–7 days · PLACEHOLDER

    Our engineers turn the instant estimate into a real, code-compliant design for your roof and electrical panel.

    We refine panel layout, string sizing, battery placement and any electrical upgrades, then share a design package with plain-English notes and the final price for your approval.

    What you'll do

    • Review and approve your engineered design
  3. Step 3: Agreements signed

    1–3 days · PLACEHOLDER

    You e-sign your installation agreement and, if applicable, your financing or lease documents.

    Each document comes with a short summary of what it covers. For financed systems, this is when your lender paperwork is completed.

    What you'll do

    • E-sign your agreement and financing documents
  4. Step 4: Site assessment

    5–14 days · PLACEHOLDER

    We confirm the design against your actual home — roof condition, attic/conduit runs, main service panel and metering.

    Often a mix of aerial/satellite imagery and a short on-site visit. If something differs from the model (for example, a panel upgrade is needed), we tell you before any work begins.

    What you'll do

    • Confirm a site-visit window if an on-site assessment is needed
  5. Step 5: Permitting

    14–42 days · PLACEHOLDER

    We prepare and submit the building/electrical permit to your city or county (the AHJ). This is usually one of the longest waits.

    Timelines are set by the jurisdiction, not by us. Some desert cities use expedited instant-permitting; others review manually. We handle submittals, plan corrections and fees.

  6. Step 6: Utility interconnection application

    10–30 days · PLACEHOLDER

    We apply to your utility to connect your system to the grid under the correct net-metering or net-billing program.

    This runs in parallel with permitting. IID and SCE have different application paths and timelines — see the note below on how they differ.

  7. Step 7: Installation scheduled

    3–10 days · PLACEHOLDER

    With the permit and interconnection in hand, we schedule your install date.

    You pick a date that works for you. We confirm crew, equipment delivery and any access needs (gate codes, pets, parking).

    What you'll do

    • Choose your installation date
    • Clear access to your roof, attic and electrical panel
  8. Step 8: Installation

    1–2 days · PLACEHOLDER

    Our crew installs your panels, battery, and any electrical upgrades — typically in one to two days.

    Most of the work is on the roof and at your service panel. There may be a short planned power interruption while we tie in. You do not need to be home the entire time, but access is required.

    What you'll do

    • Provide site access on install day
  9. Step 9: Inspection

    5–14 days · PLACEHOLDER

    A local inspector verifies the installation meets electrical and building code.

    We schedule and attend the inspection. If the inspector notes a correction, we address it and re-inspect. Your system is not energized yet.

  10. Step 10: Permission to operate (PTO)

    7–30 days · PLACEHOLDER

    Your utility gives final approval to turn the system on and connect to the grid.

    Until PTO is granted, the system stays off (a battery may be configured not to export). PTO timing is controlled by the utility. For leases, payments typically begin at PTO.

  11. Step 11: Activation & monitoring

    1–2 days · PLACEHOLDER

    We commission the system, switch it on, and set up monitoring so you can watch production and savings.

    We verify production and battery behavior, walk you through monitoring, and confirm your warranty coverage. From here you are generating your own power.

    What you'll do

    • Set up your monitoring login

The approvals

Permits, utility & PTO, explained

Two separate approvals sit between a finished install and a system you're allowed to run. They come from two different authorities, on two different clocks.

1. Building & electrical permit

Your city or county — the authority having jurisdiction, or AHJ — reviews the engineered plans and issues a permit to do the work. After installation, a local inspector visits to confirm it was built to code. Some jurisdictions offer same-day instant permitting; others review plans by hand.

2. Utility interconnection

Separately, we apply to your electric utility for permission to connect your system to the grid under the correct net-metering or net-billing program. This is a different application, reviewed by the utility — not the city — and it usually runs in parallel with permitting.

3. Permission to operate (PTO)

Once the install passes inspection and the interconnection is approved, the utility issues permission to operate. Until PTO is granted, the system stays off — a battery can be configured not to export — even if it's fully installed. PTO is the last gate before you start generating your own power.

Your utility

Your utility's interconnection

Every address is served by a specific electric utility, and that utility — not your city — decides how your system connects to the grid. Which utility serves you shapes your application path, the program your exported energy is credited under, and how long approvals tend to take. All of it varies widely from one utility and state to the next.

The application path

Some utilities are investor-owned and regulated by a state commission; others are municipal or cooperative utilities that run their own process and their own rules. That determines the forms, the engineering review, and the queue your interconnection waits in. Typical application-to-PTO time is roughly PLACEHOLDER days, depending on your utility.

How exports are credited

Net metering, net billing, and buy-all/sell-all arrangements each value your exported energy differently, and the rules differ by utility and state — some grandfather older, more generous terms. Typical application-to-PTO time is roughly PLACEHOLDER days once the program and tariff are confirmed.

Programs, tariffs, and timelines are set by each utility and can change. We confirm which utility and program apply to your address during design and tell you what to expect — we never guarantee a specific credit rate or approval date. You can look up what applies in your state.

If your home is in an HOA

Many states have solar-access or solar-rights laws that sharply limit an HOA board's ability to block a rooftop solar system or to impose restrictions that significantly raise its cost or reduce its output. That said, many associations still have an approval or aesthetic-review step — for example, submitting the panel layout for sign-off. We help you prepare and submit that paperwork so the review doesn't slow your project down.

Sample project portal

See a sample project portal

Explore a demo order-status portal that walks through all eleven stages — documents, timeline, and milestones — so you know exactly how you'll track your own project.

Open the demo portal

Stage names shown throughout this page: Deposit received, Design review, Documents signed, Site assessment, Permitting, Utility application, Installation scheduled, Installed, Inspection, Permission to operate, Activated.